[PAGE 1]
Historic Resource Commission
Meeting Minutes
January 22, 2025
I . C a l l t o O r d e r
Commissioner Unger called the meeting to order at 6:00 p.m.
I I . R o l l C a l l
 PRESENT: Richard Unger Chair, Patricia Yager, Zakhar Berkovich, Michael Barron, Pablo
Sepulveda, Sergy Dossous Assistant Planner, Andrew Dachinger Counsel
 ABSENT: None
 EXCUSED: None
III. Conflicts of Interest
None
IV. Adaption of Prior Meeting's Minutes
Commissioner Unger requested to move the adaption of the minutes to the end of the
agenda since there were only two items on the agenda, and the rest of the commissioners
agreed.
V. Modification to the agenda
 Moved the adaption of prior meeting minutes to the end
 Commissioner Unger requested to move items 1 and 2 to the consent agenda since the
commissioners and the applicants had seen staff’s recommendations.
Commissioner Sepulveda made a motion to items 1 and 2 to the consent agenda.
Commissioner Barron seconded the motion.
Items 1 and 2 were moved to the consent agenda.
Note: Unless otherwise specifically modified by the HRC, all applications approved by the HRC
are subject to the following minimum conditions of approval:
 Prior to any work beginning, all necessary permits shall be secured; and
 All work shall be completed within one year.
VI. Consent Agenda
1. Consideration for approval submitted by Lawrence James to install new gutters to the
house. The property is located in the Stockade Historic District at 205 Green Street.
Staff recommends that the HRC grant a Certificate of Appropriateness to install new
gutters, for property located at 205 Green Street, subject to the following conditions:
Page 1 of 5

[PAGE 2]
A. A white 5” or 6” aluminum gutter shall be installed across the front of the
house, attached to the eave.
B. A white aluminum downspout shall be attached to the gutter on the right-hand
side of the house. The downspout shall run along the righthand side of the
house along the white corner trim.
C. The downspout shall direct water drainage to the side yard, away from the front
sidewalk.
D. All paint and material brand names, model names and code numbers shall be
submitted to staff for approval and the case file.
E. Prior to any work beginning, all necessary permits shall be secured.
F. All work shall be completed within one year.
Findings: Type II SEQRA. These modifications are in accordance with the city’s codes
264-76H 2(a, b, d), and 3 and the Secretary of the Interior’s Standards (2, 4, 9, 10).
2. Consideration for approval submitted by Ashraf Ghaly to replace the roof of the house.
The property is located in the Union Street Corridor Historic District at 855 Union
Street.
Staff recommends that the HRC grant a Certificate of Appropriateness to replace the
roof of the house, for property located at 855 Union Street, subject to the following
Condition:
A. Existing shingles shall be replaced with Timberline HDZ Hickory Algae Resistant
Laminated High-Definition Shingles.
B. The color of all drip edges will be similar to the present cream white color, to be
approved by staff.
C. Valley gutter drainage shall be aluminum, matching the existing valley gutter
system.
D. Install snow guards to the roof. Snow guards shall be Pipe Fence-Style from Rocky
Mountain Snow Guards Inc, as submitted.
E. All paint and material brand names, model names and code numbers shall be
submitted to staff for approval and the case file.
F. Prior to any work beginning, all necessary permits shall be secured. and
G. All work shall be completed within one year.
Findings: Type II SEQRA. These modifications are in accordance with the city’s codes
264-76H 2(a, c), and 3 and the Secretary of the Interior’s Standards (2, 4, 6).
The commissioners did not have any questions for items 1 “205 Green Street” and for item 2 “855 Union
Street” Commissioner Barron had a question for the applicant. Item 2 was moved from the consent
agenda and placed back to the regular agenda under “New Application/ Business”.
Page 2 of 5

[PAGE 3]
CONSENT AGENDA RESOLUTION
Commissioner Berkovich made a motion to approve the consent agenda
Commissioner Barron seconded the motion.
Motion carried unanimously.
VII. New Applications/ Business
1. Consideration for approval submitted by Ashraf Ghaly to replace the roof of the house.
The property is located in the Union Street Corridor Historic District at 855 Union
Street.
Staff recommends that the HRC grant a Certificate of Appropriateness to replace the
roof of the house, for property located at 855 Union Street, subject to the following
Condition:
A. Existing shingles shall be replaced with Timberline HDZ Hickory Algae Resistant
Laminated High-Definition Shingles.
B. The color of all drip edges will be similar to the present cream white color, to
be approved by staff.
C. Valley gutter drainage shall be aluminum, matching the existing valley gutter
system.
D. Install snow guards to the roof. Snow guards shall be Pipe Fence-Style from
Rocky Mountain Snow Guards Inc, as submitted.
E. All paint and material brand names, model names and code numbers shall be
submitted to staff for approval and the case file.
F. Prior to any work beginning, all necessary permits shall be secured. and
G. All work shall be completed within one year.
Findings: Type II SEQRA. These modifications are in accordance with the city’s codes
264-76H 2(a, c), and 3 and the Secretary of the Interior’s Standards (2, 4, 6).
Commissioner Barron had a question for the applicant. He asked him if the flashings
would need to be replaced, the applicant told him that the existing flashings were
aluminum, and he was not planning on replacing them. Commissioner Barron made an
amendment to the staff recommendation to add “repair and/ or replace flashings if
necessary”.
Resolution
Commissioner Barron made a motion to grant a Certificate of Appropriateness as
recommended by staff with the following amendments:
A. Existing shingles shall be replaced with Timberline HDZ Hickory Algae Resistant
Laminated High-Definition Shingles.
B. The color of all drip edges will be similar to the present cream white color, to be
approved by staff.
Page 3 of 5

[PAGE 4]
C. Valley gutter drainage shall be aluminum, matching the existing valley gutter
system.
D. Install snow guards to the roof. Snow guards shall be Pipe Fence-Style from
Rocky Mountain Snow Guards Inc, as submitted.
E. Repair and/ or replace flashings in kind, if necessary.
F. All paint and material brand names, model names and code numbers shall be
submitted to staff for approval and the case file.
G. Prior to any work beginning, all necessary permits shall be secured.
H. All work shall be completed within one year.
Findings: Type II SEQRA. These modifications are in accordance with the city’s codes
264-76H 2(a, c), and 3 and the Secretary of the Interior’s Standards (2, 4, 6, 7).
Commissioner Berkovich seconded the motion.
There was no discussion on the motion.
Motion carried Unanimously.
VIII. Adaption of Prior Meeting's Minutes
Commissioner Unger discussed the December’s 18 minutes with the commissioners. They
corrected some of the typos and the changes that were made to the staff recommendation
that were not reflected in the final resolution. Following the corrections made by the
commissioners, commissioner Unger called for a motion.
Commissioner Berkovich made a motion to approve the December18th minutes with the
corrections.
Commissioner Barron seconded the motion.
There was no discussion on the motion.
Motion carried unanimously.
IX. Miscellaneous
 Commissioner Unger asked counsel to explain their previous comment about the
“Determination letter for the zoning officer”. Counsel explained that the letter
would be considered a conflict of interest. He added, the correct way to deal with
distressed properties would be to call or email the planning department and ask
them to check the address without giving them any details on the property. The
planning staff would then go to such property and make the determination on if it
should be coming to the HRC.
 Staff informed the commissioners about the culvert repairs that the Engineering
Department would be doing in the GE plot. As part of those repairs some trees will
be taken down. The commissioners asked counsel to clarify if a mediation plan was
available, and if so, would they present it to the HRC. The commissions also asked
counsel to clarify who would be responsible for the tree remediation since the
repair would be done by a third party and not the owners.
Page 4 of 5

[PAGE 5]
X. Adjourn
Commissioner Unger adjourned the meeting.
Meeting is adjourned at 7:30 PM.