unclassified
8 Post Construction
· Adamsville, AL
📄
Source: 8 Post Construction
(PDF)
Retrieved April 25, 2026
from www.cityofadamsville.org ↗
Confidence:
95%
High
Summary
The City of Adamsville enacts an ordinance to address post-construction stormwater management standards, requiring the implementation of best management practices to prevent or minimize water quality impacts. The ordinance sets forth design standards, administration, and enforcement procedures for qualifying sites. The goal is to ensure that the volume and velocity of pre-construction stormwater runoff are not significantly exceeded.
Details
- Subject
- stormwater management
- Summary
- The City of Adamsville enacts an ordinance to address post-construction stormwater management standards, requiring the implementation of best management practices to prevent or minimize water quality impacts. The ordinance sets forth design standards, administration, and enforcement procedures for qualifying sites. The goal is to ensure that the volume and velocity of pre-construction stormwater runoff are not significantly exceeded.
- Action Type
- new
- Vote Result
- passed
- Adoption Date
- 2024-02-14
- Enacting Body
- City Council of the City of Adamsville, Alabama
- Effective Date
- 2024-03-01
- Ordinance Number
- Ord. 2024-01