San Antonio Dam Spillway Replacement Project
July 9, 2025 · Monterey, CA
📄
Source: Source Document
(PDF, 5 pp)
Retrieved April 30, 2026
from legistar.granicus.com ↗
Confidence:
90%
High
Summary
The San Antonio Dam Spillway Replacement Project is a critical infrastructure project aimed at replacing the existing spillway. The project has undergone various stages, including a probable maximum flood update and alternatives analysis, design, environmental assessment, and construction planning. The project timeline indicates that the 30% design submittal is anticipated by June 2026, with construction expected to start by Summer 2028. The project is subject to DSOD review and approval, environmental permitting, and construction funding.
Details
- Subject
- San Antonio Dam Spillway Replacement Project
- Summary
- The San Antonio Dam Spillway Replacement Project is a critical infrastructure project aimed at replacing the existing spillway. The project has undergone various stages, including a probable maximum flood update and alternatives analysis, design, environmental assessment, and construction planning. The project timeline indicates that the 30% design submittal is anticipated by June 2026, with construction expected to start by Summer 2028. The project is subject to DSOD review and approval, environmental permitting, and construction funding.
- Report Date
- 2025-07-09
- Report Type
- project update
- Report Title
- San Antonio Dam Spillway Replacement Project Update
- Authoring Body
- Monterey County Water Resources Agency