The City Council of Prior Lake authorizes Change Order 1 for the Lakeside Sewer Lining Project, which includes raising three additional manholes at a cost of $25,281.93. This change order represents a 2.1% increase to the construction contract. The funding for Change Order 1 shall come from the Sewer Utility Fund 604.
Details
Subject
Lakeside Sewer Lining Project (2021-14)
Summary
The City Council of Prior Lake authorizes Change Order 1 for the Lakeside Sewer Lining Project, which includes raising three additional manholes at a cost of $25,281.93. This change order represents a 2.1% increase to the construction contract. The funding for Change Order 1 shall come from the Sewer Utility Fund 604.