05(E) - Resolution Approving a Work Order for Construction Materials Testing for the Northwood Road Area Phase 1 Project (2026-01) Report
March 24, 2026 · Prior Lake, MN
📄
Source: 05(E) - Resolution Approving a Work Order for Construction Materials Testing for the Northwood Road Area Phase 1 Project (2026-01) Report
(HTML)
The City Council of Prior Lake, Minnesota, approved a resolution to authorize a work order with WSB LLC for construction materials testing for the Northwood Road Area Phase 1 Project. The work order is valued at $49,165 and is part of the larger Northwood Road project, which includes reconstruction, full-depth reclamation, and mill & overlay to 3.6 miles of roadway. The project also includes the addition of a sidewalk on the west side of Fremont Ave NW.
Details
Subject
Northwood Road Area Phase 1 Project construction materials testing
Summary
The City Council of Prior Lake, Minnesota, approved a resolution to authorize a work order with WSB LLC for construction materials testing for the Northwood Road Area Phase 1 Project. The work order is valued at $49,165 and is part of the larger Northwood Road project, which includes reconstruction, full-depth reclamation, and mill & overlay to 3.6 miles of roadway. The project also includes the addition of a sidewalk on the west side of Fremont Ave NW.