Menu
unclassified

Construction of a 150-170 MW power generation facility with associated infrastructure, including septic systems and potable water storage.

July 22, 2025 · Arapahoe, NC
Source: Source Document (PDF, 5 pp)
Retrieved April 30, 2026 from arapahoe.legistar1.com ↗
Confidence: 90%
High