The Town of Elbridge Planning Board meeting was held on December 9, 2025, to discuss various site plans and extensions. The board approved site plans for properties at 598 NY 5 and 1134 Route 5, with conditions, and granted a third 6-month extension for site plan approval to Norbut Solar. The meeting also included a public hearing and the approval of minutes from a previous meeting.
Details
Summary
The Town of Elbridge Planning Board meeting was held on December 9, 2025, to discuss various site plans and extensions. The board approved site plans for properties at 598 NY 5 and 1134 Route 5, with conditions, and granted a third 6-month extension for site plan approval to Norbut Solar. The meeting also included a public hearing and the approval of minutes from a previous meeting.