unclassified
Redmond Central Connector, Phase 3
May 5, 2026 · Redmond, WA
📄
Source: Source Document
(DOCX)
Retrieved May 1, 2026
from redmond.legistar1.com ↗
Confidence:
85%
High
Summary
The Redmond Central Connector is a key regional link from Redmond to Issaquah, and Phase 3 is the final stage of the project, consisting of 1.6 miles of trail. The completed trail is expected to be used by 250,000 people annually and was substantially complete in the summer of 2025. The project has a total funding of $8,075,001 and estimated project costs of $8,075,001. The project is part of the larger East Rail, a 42-mile corridor between Snohomish County and Renton.
Details
- Subject
- Redmond Central Connector, Phase 3
- Summary
- The Redmond Central Connector is a key regional link from Redmond to Issaquah, and Phase 3 is the final stage of the project, consisting of 1.6 miles of trail. The completed trail is expected to be used by 250,000 people annually and was substantially complete in the summer of 2025. The project has a total funding of $8,075,001 and estimated project costs of $8,075,001. The project is part of the larger East Rail, a 42-mile corridor between Snohomish County and Renton.
- Report Date
- 2024-05-21
- Report Type
- project
- Report Title
- Redmond Central Connector, Phase 3