Menu
unclassified

Construction of a 150-170 MW power generation facility, including power generation units, a control room building, an administrative/maintenance building, a stormwater detention pond, drive aisles, a fire suppression loop, and parking for employees.

July 24, 2024 · Arapahoe, NC
Source: Source Document (PDF, 2 pp)
Retrieved April 30, 2026 from arapahoe.legistar1.com ↗
Confidence: 90%
High