Menu

Arapahoe Documents

Arapahoe, North Carolina · 167 documents
Range:
Types:
Unclassified

Construction of a 150-170 MW power generation facility, including power generation units, a control room building, an administrative/maintenance building, a stormwater detention pond, drive aisles, a fire suppression loop, and parking for employees.

Arapahoe, NC · July 24, 2024

Canyon Peak Power LLC is proposing a 150-170 MW power generation facility within Arapahoe County, to be located at 5050 N County Rd 129, Bennett, CO 80102. The project includes power generation units,

via arapahoe.legistar1.com · PDF